MCI-Blog-Hero-Banner

Leveraging Prefabrication to Save Time and Cost

Posted by Tim Nichols on Mar 27, 2023

Contributors to this article include Laura Jensen and David Artman, Principals at Array. 

Many healthcare projects face extreme budget fatigue with the economic challenges created by rising inflation.....READ MORE

Topics: prefabrication

Eliminating Rework by Taking Advantage of Prefabrication

Posted by Cheryl Woo on Nov 23, 2020

Our team at Array designed prefabricated exterior panels to clad the 473,000 SF medical center. Aside from one spot where a steel support was installed at the wrong elevation and resulted in an.....READ MORE

Topics: Healthcare Design, prefabrication

Prefabrication at Inspira’s Mullica Hill Hospital: Accelerating Speed to Market

Posted by Guest Contributor on Nov 26, 2019

As the industry shifts to more collaborative project delivery methods, teams are looking for ways to lead more effective engagements. Major concerns include keeping construction costs down, reducing.....READ MORE

Topics: inspira mullica hill, prefabrication

Latest Tweets